Project pricing

How much does app and MVP development cost?

We do not publish a fictional starting price. Two projects with the same label can require very different user flows, integrations, and release work. We first define the boundaries of the first version, then estimate the work by stage.

Compare development services

Cost by product type

The product name is only the starting point

The estimate is driven by what users need to do, what systems the product connects to, and what must be ready for release. These are the main cost drivers for each service.

What shapes the budget

Six factors with the greatest impact on the estimate

A useful estimate is not a guess multiplied by an hourly rate. It connects the product goal to specific flows, technical decisions, and release responsibilities.

01

Scope of the first version

The number of user roles, screens, scenarios, and business rules determines how much product work is required.

02

Platforms and devices

A browser product, a mobile application for one or two platforms, and a shared backend require different delivery plans.

03

Design readiness

Existing research and layouts can shorten preparation. If they are missing, user flows, prototypes, and interface design become part of the scope.

04

Integrations and data

Payments, maps, CRM, ERP, authentication providers, device APIs, and data migration add implementation and testing work.

05

Quality requirements

Security, load, offline mode, accessibility, audit trails, and complex permissions can materially change the architecture and testing effort.

06

Release and support

App-store publication, infrastructure setup, monitoring, documentation, warranty work, and ongoing development are agreed separately in the delivery plan.

From request to estimate

How we prepare a project estimate

After a short brief, we usually prepare the initial staged estimate within two business days. If the product has major technical unknowns, we identify them before treating the figure as a commitment.

  1. 1

    Understand the outcome

    We discuss the business goal, audience, current materials, target platforms, and the result the first release must produce.

  2. 2

    Define the first version

    We outline the core user journey, separate required functions from later ideas, and record assumptions that affect the estimate.

  3. 3

    Break down the work

    We group tasks into product, design, engineering, testing, and release stages, then show dependencies and known risks.

  4. 4

    Agree on milestones

    Before development begins, the deliverables, acceptance points, payment milestones, timeline, and ownership terms are documented in the estimate and contract.

Pricing FAQ

Questions about estimates and payments

The exact figure appears after the scope is understood. These answers explain what happens before that point and how the budget stays controlled afterwards.

Why is there no fixed price list on the website?
A mobile app, web product, or MVP is not a standard package. User roles, integrations, design readiness, data, and release requirements can change the amount of work several times over. A staged estimate based on the actual first version is more useful than an advertising price that excludes essential work.
Can I get a rough range before a full specification exists?
Yes. A detailed specification is not required for the first estimate. A short brief about the goal, audience, platforms, main user journey, existing materials, and integrations is enough to prepare an initial range and list the assumptions behind it.
What is included in the development estimate?
The estimate is divided into the agreed stages, which may include product analysis, UX and interface design, frontend and backend development, integrations, testing, release preparation, and documentation. We show what is included and what remains outside the current version.
How can the first-release budget be reduced?
The safest way is to keep one central user journey, postpone secondary roles and automations, reuse reliable services where appropriate, and avoid building speculative features before the main hypothesis is tested.
How are payments organised?
We work under a contract and divide the project into milestones with defined deliverables. Payment is tied to those agreed stages, so the client can compare progress with the estimate throughout development.
Who owns the source code after payment?
The client owns the source code and project documentation under the terms agreed in the contract. The deliverables and transfer of rights are documented before work begins.
Is post-launch support included?
Release responsibilities and the warranty period are recorded in the project terms. Monitoring, dependency updates, fixes, and new feature development can continue afterwards under a separately agreed support format.

Want an estimate based on your actual product?

Tell us the goal, the main user journey, and what materials already exist. We will identify the next step and the information needed for a realistic estimate.